How Far to Trust an AI Draft: Five Lines You Check Yourself
No second look at the rest. Five lines get checked by hand.
When the Lowest Unit Price Is Not the Optimal Factory: Checking the Line Schedule First
Unit price is half a quote. The other half is whether a line is free that week.
Why the First Week Loses Money: Putting the Learning Curve into the Quote
The 40% on day one is a design value. The quoting figure is a different number.
What Man Power 0.5 Means: Three Ways to Break a Bottleneck
Man Power is a speed dial, not a headcount. Keep the order and the CM stays put.
How to Read an Operation Breakdown: Operations, SMV, Takt, Man Power
Four things you need in order to read the table. Start with Takt and the rest falls into order.
Process Analysis Is Cost Design: Six Steps Where AI Builds the CM
From one tech pack to a pre-costing sheet. AI makes the draft, people make the call.
UX Note (2): Global UX Writing for Apparel Production Sites
What should global UX writing look like in apparel production environments? Let’s explore UX writing experiences shaped by diverse on-site realities.

UX Note (1): UX Writing Starts with Defining Field Terminology
Worker, Operator, Công nhân… Why Terminology Had to Be Unified for a Global Service

Featured
- How Factory Data Moves to Korea’s Dashboard (1)
- 2025. 06. 09 | Pin
- Sewing Factory IoT War (1) : The Battle Between Real-Time Data and the Cloud
- 2025. 07. 21 | Pin
