main logo    |   tech blog
Blog Authors Official official icon language icon search icon close icon hamburger icon
  • Kr
  • En
search icon
  • Blog
  • Authors
  • Official ↗
All AboutWorkspaceStory
search
Two Styles on One Line at the Same Time: The Modular Line and the Line Schedule
Insight 2026. 11. 03 | Door Door
한 라인이 두 레인으로 나뉘어 두 스타일이 같은 기간에 진행되는 Monolis 스케줄 화면(디자인 시안, 예시 데이터)
What ‘One Car Every Minute’ Means: From Ford’s Moving Assembly Line to Takt on the Sewing Line
Insight 2026. 11. 01 | Door Door
1913년 포드 하이랜드파크 공장의 플라이휠 마그네토 조립 라인에서 작업자들이 긴 작업대를 따라 줄지어 조립하는 장면을 미드센추리 일러스트로 그린 그림
Why We Build the Data Structure Before the Screens
How to build an ERP for an apparel vendor where one order turns into hundreds of rows
Insight 2026. 10. 29 | Door Door
Diagram: one order grows to 3 Buyer POs, 12 PO-color rows and 72 size-quantity rows; 5 fabrics grow to 20 fabric-color rows and 360 consumption rows
How Accurate Is an AI-Generated SMV? Scoring SMV Error with MAPE
An SMV error rate has to be read together with the test, the representative value, the direction and the band it was measured on.
Insight 2026. 10. 26 | Door Door
SMV 오차율 중앙값 막대그래프. 초기 엔진 3,458개 스타일에서 기준선 19.9%, AI 엔진 11.9%. 같은 5,014개 스타일, 비슷한 이력 상위 25% 구간에서 이전 엔진 9.3%, 현재 엔진 6.3%.
Why Small-Order Quotes Need No Separate Surcharge Table: Dividing CM by the Costing Target
CM is the daily line cost divided by the Costing Target. A smaller order means a smaller divisor and a higher CM.
Insight 2026. 10. 20 | Door Door
Where Does 40% on Day One Come From? Three Indicators That Define the Loss Zone of the Learning Curve
40% on day one is a starting value. Read the loss zone with three numbers and correct it with factory data.
Insight 2026. 10. 19 | Door Door
1~4일 차 부족분을 면적으로 칠해 출발점 40%, 도달일 5일 차, 손실 면적 115%를 보여 주는 막대 도식
Why Order Quantity Divided by the Daily Target Is Not the Production Days: The Learning Curve and the Line Schedule
Quantity divided by the daily target is too short for small orders and too long for large ones.
Insight 2026. 10. 18 | Door Door
3,000 pcs 오더의 Costing Target 424 pcs, Est. Product Days 7.1일을 보여 주는 Monolis 러닝커브 화면(예시 데이터)
From 4.7% on the Quote to 3.4% at Settlement: Pre-Costing in Practice
Build the pre-cost line by line from materials, watch it get cut in negotiation, and see how profit keeps shrinking after the price is fixed.
Insight 2026. 10. 15 | Door Door
Three bars showing one order's profit falling from 4.7% on the confirmed cost to 3.8% at ordering and 3.4% at settlement
firstprev1 2 3 … 6nextlast
Featured
How Factory Data Moves to Korea’s Dashboard (1)
2025. 06. 09  |  Pin
Sewing Factory IoT War (1) : The Battle Between Real-Time Data and the Cloud
2025. 07. 21  |  Pin
Tag
HistorySIJEMonologMonolisPeopleTechAIDXBootcampBack-endFront-endUI/UXBXReferenceIO
Homepage Monolis Monolog
Copyright© 2023, Sije International. All right reserved. Business Registration No : 444-88-02133