How Far to Trust an AI Draft: Five Lines You Check Yourself
No second look at the rest. Five lines get checked by hand.
When the Lowest Unit Price Is Not the Optimal Factory: Checking the Line Schedule First
Unit price is half a quote. The other half is whether a line is free that week.
Why the First Week Loses Money: Putting the Learning Curve into the Quote
The 40% on day one is a design value. The quoting figure is a different number.
What Man Power 0.5 Means: Three Ways to Break a Bottleneck
Man Power is a speed dial, not a headcount. Keep the order and the CM stays put.
How to Read an Operation Breakdown: Operations, SMV, Takt, Man Power
Four things you need in order to read the table. Start with Takt and the rest falls into order.
Process Analysis Is Cost Design: Six Steps Where AI Builds the CM
From one tech pack to a pre-costing sheet. AI makes the draft, people make the call.
SIJE Talk+ : Ep.2 – SHEIN and the Apparel Industry Crisis
The global apparel market is worth $1.7 trillion. In a collapsing middle market, where should companies go next?

PO Mapping, Possibilities of AI and the Realities of Coding
PO mapping is a critical challenge for apparel vendors, far beyond simple document handling. Let’s see how Monolis addresses format confusion, repetitive entry, and time pressure.

Featured
- How Factory Data Moves to Korea’s Dashboard (1)
- 2025. 06. 09 | Pin
- Sewing Factory IoT War (1) : The Battle Between Real-Time Data and the Cloud
- 2025. 07. 21 | Pin
