Catching the AI Drafts Likely to Be Wrong: The Similarity Gate and Trust Grades A, B and C

AI Agents Now Work in Sewing Factories: The Tense Data Core
On top of the Tense data core, which organizes operation names and operation times into the company's standard, AI agents assemble operation breakdown drafts and quote CM.

How Accurate Is an AI-Generated SMV? Scoring SMV Error with MAPE
An SMV error rate has to be read together with the test, the representative value, the direction and the band it was measured on.

Why Small-Order Quotes Need No Separate Surcharge Table: Dividing CM by the Costing Target
CM is the daily line cost divided by the Costing Target. A smaller order means a smaller divisor and a higher CM.

Where Does 40% on Day One Come From? Three Indicators That Define the Loss Zone of the Learning Curve
40% on day one is a starting value. Read the loss zone with three numbers and correct it with factory data.

Why Order Quantity Divided by the Daily Target Is Not the Production Days: The Learning Curve and the Line Schedule
Quantity divided by the daily target is too short for small orders and too long for large ones.

From 4.7% on the Quote to 3.4% at Settlement: Pre-Costing in Practice
Build the pre-cost line by line from materials, watch it get cut in negotiation, and see how profit keeps shrinking after the price is fixed.
How Far to Trust an AI Draft: Five Lines You Check Yourself
No second look at the rest. Five lines get checked by hand.
Featured
- How Factory Data Moves to Korea’s Dashboard (1)
- 2025. 06. 09 | Pin
- Sewing Factory IoT War (1) : The Battle Between Real-Time Data and the Cloud
- 2025. 07. 21 | Pin
