AI Agents Now Work in Sewing Factories: The Tense Data Core
The knowledge of 500 veterans with 30 years on the floor, carried over intact: the company’s digital brain
KEY POINTS
An AI agent is an AI that takes on work in place of people and asks the responsible person to confirm wherever a decision is needed. AI of this kind never reached the sewing floor because operation names and operation times were inconsistent even inside a single company. The Tense data core is the standard that lets a company’s HQ and overseas factories see the same operation names and the same operation times, and it is an asset owned by that company, built from its own orders and floor measurements. Reading this standard, the AI agent assembles operation breakdown drafts, quotes CM and sends candidates for standard changes to the person in charge.
AI agents now work in sewing factories too. This post explains what data has to be in place before an AI agent can work on the sewing floor, and what the Tense data core that holds this data is.
Why AI agents never reached the sewing floor

An AI agent does more than answer questions: it takes on work in place of people. Where a decision is needed, such as finalizing a quote or changing a standard, it gets confirmation from the person in charge before moving on.
A self-driving car is a useful comparison. Before a car can drive itself, it needs a map that captures the roads accurately. If the same road carries a different name in every town and the travel time for the same stretch differs from record to record, even a capable car ends up guessing its way. The operation data on the sewing floor was in exactly that state.
- Operation analysis depends on each analyst’s experience. A skilled analyst needs several hours to analyze one style, and the quality of the analysis depends on the analyst’s experience.1
- The same operation is written under different names in each factory. Operation names are free text mixing English and Indonesian, and 236 different machine notations alone have been observed on the floor.1
- For the same style, factory, fabric and size group, records with different standard times pile up, and there is no basis for deciding which one should be the standard.1
- In brand cost sheets, material cost is fully calculated from BOM, consumption, loss and unit price, but the labor line is written as an unsupported base rate plus increments for details.1
- Items that people have to type in go empty over time. In one sewing floor MES, the items collected automatically kept filling up, while the SMV entry rate that relied on people fell from 84% to 27%.1

Because AI works far faster than people, reading this data as it is produces wrong CM just as fast, and in a confident tone. What an AI agent on the sewing floor needs first is not a better model but an operation standard the company can trust.
The Tense data core: the company’s operation standard
The Tense data core is a sewing operation data dictionary for cost design and a single source of truth (SSOT) that lets every site of one company see the same operation names and the same operation times. In the terms of the earlier comparison it is the company’s operations map: an operation is a stretch of road, and the operation time (SMV) is the travel time for that stretch.
The reason operation time has to be fixed first lies in the CM formula.2
The first value in the formula is SMV by operation. The operation times for one garment are added up, then multiplied and divided in turn by loss rate, factory efficiency, the learning curve and the rate per minute to give the CM. However precise the rest of the calculation is, if that first operation time is wrong, the CM is wrong too.

Within a company, this standard is the same at every site. The HQ costing team writing a quote and the factories in Vietnam and Indonesia planning their lines use the same operation names and the same operation times. That ends the practice of HQ and factory calculating CM for the same style with different times (Why Vendor and Factory Calculate the Same CM in Opposite Directions).

Across companies, on the other hand, the standard is different. Even the same front panel operation takes a different amount of time depending on the plant’s machines, operator skill, main fabrics and buyer quality standards. That is why the Tense data core compares standard time in units of style × factory × fabric × size group. This standard therefore cannot be bought from another company. It is built only as that company’s orders and measurements accumulate, and borrowing another company’s standard times will not get your own factory’s CM right.

The numbers an AI agent uses depend on this difference as well. A general-purpose AI knows the industry in general terms but not the operation times of your factory. An agent that reads your company’s data core quotes with your company’s numbers rather than industry averages, and from that point it becomes your company’s AI.

The data core SIJE built
SIJE built its data core from operation analysis records written between June 2022 and August 2026.2 The sources are of four different kinds: operation breakdowns, pairs of analysis requests and their results, MES production output, and 20 brand cost sheets.

The first task was cleaning up names. The operation names written freely across 1,021,940 operation records were grouped into 47,359 standard operations. Whether two machine notations refer to the same machine was not decided by a person’s feel but by whether they had ever been used together in one style: if both appear in the same style, they are different machines. The details of this work are in Ontology in Practice (2).

The second task was cleaning up times. The same style, factory, fabric and size group are treated as one comparison unit, and when one unit holds several times, a set of ruling rules selects the standard. For example, when the same style was analyzed several times, the most recent analysis confirmed as agreed (Agree) takes priority.

The third task was keeping records. Records that lost in the ruling or that conflict with each other are not deleted but kept in a ledger, which now holds 1,873 records. Every value carries its source file, sheet, row number and calculation method, so the source of any number can be found at once. This is the record that comes out when a buyer asks for the basis of a CM.

After these three tasks, one standard operation holds its machine and stitch class, part, time by factory, standard time and the basis for it on a single card.


A standard that gets sharper with every order
Just as a map gets more precise the more cars drive on it, the data core recalculates operation times every time an order runs, taking production output from Monolis and floor measurements from Monolog.2

Averaging floor values as they are distorts the standard time, because machine breakdowns, shift changes and recording mistakes are mixed in. Incoming values therefore go through a fixed sequence. If most measurements of an operation fall between 20 and 30 seconds but 95 seconds was recorded on a day the machine stopped, the 95 seconds is treated as an outlier and left out of the standard calculation. The middle value of what remains becomes the standard candidate, and the faster time that skilled operators achieve consistently becomes the optimal time candidate.

Even when a newly calculated value differs from the current standard, it does not overwrite the standard right away. It is raised as a change candidate with its sample size, period and source attached, and the person in charge only reviews and approves. The approved value and its basis remain as history.

What a sewing AI agent does
Just as a self-driving car drives itself on the map while a person takes the wheel in risky stretches, the AI agent works by the data core’s standard and gets confirmation from the person in charge wherever a decision is needed. Judgment, proposals and execution belong to Monolis and Monolog with Tense AI, and the data core is the standard behind that judgment.
- Assembling breakdown drafts: when a new style comes in, the agent finds similar past styles in the data core, takes their operation structure and operation times, and assembles a draft. The analyst’s work ends at reviewing and adjusting the draft. Validated on cases where a similar past style exists (the top 25% similarity band), the operation structure match (F1) was 84.6% and the total SMV error was 6.3%.2
- Quoting CM: the agent puts the draft’s operation times into the CM formula to calculate CM per piece. Large and small orders have different daily targets and therefore different CM, and the agent shows that difference on an operation basis (Why Small-Order Quotes Need No Separate Surcharge Table).
- Change candidates and impact: the agent finds operations where floor measurements deviate from the standard and raises them as change candidates. Changing one operation time changes the CM of every style that uses that operation, so the agent attaches the number of affected styles first and asks the person in charge to confirm.
- Showing the basis for the labor line: when a buyer asks for the basis of the labor cost, the agent presents operation-level times together with their original sources.


When the person in charge approves a change candidate, the value goes into the data core, and the drafts and quotes for the next order are built from it.

What disappears in a company with a data core

- Tracking down a former colleague to find the basis for a labor cost
- HQ and factory calculating CM for the same style with different times
- Rebuilding the operation breakdown for a new style from scratch
- Repeated data entry by floor staff. Entries per case are kept to 5 or fewer and the rest is filled in automatically.2
- Operation knowledge and ruling history leaving the company along with a skilled employee

Wrapping up
On the sewing floor, how good an AI agent is depends less on which model it uses than on the company standard it reads. The Tense data core lets HQ and overseas factories see the same operation names and the same operation times, gets more precise as orders accumulate, and belongs to the company. In the six stages of manufacturing knowledge assetization, this corresponds to stage 2 (the sewing data dictionary) and stage 3 (building a single source of truth).3
Glossary
AI agent
An AI that takes on work in place of people and gets confirmation from the person in charge wherever a decision is needed.
SSOT (Single Source of Truth)
Standard data kept in one place so that departments and sites refer to the same values.
Standard operation
A standard name that groups operation names written differently on the floor when they refer to the same operation.
SMV (Standard Minute Value)
The standard working time, in minutes, that a skilled operator needs to perform one cycle of an operation by the defined method.
Comparison unit
The set of conditions treated as one group when comparing standard times. The Tense data core uses style × factory × fabric × size group as one unit.
Outlier
A value far from most others, such as one caused by a machine breakdown or a recording mistake. It is left out of the standard calculation.
F1
A value from 0 to 100% showing how closely the operation structure assembled by AI matches the operation structure in the actual operation breakdown.
Confirmation (HITL, Human in the Loop)
A way of working in which a person reviews and approves what the AI produces before it takes effect.
👉 How Measured Values Become a Company Asset
👉 Ontology in Practice (2) : Four Tasks Behind a Sewing Data Dictionary
👉 How Accurate Is an AI-Generated SMV? Scoring SMV Error with MAPE
References
- SIJE internal document. Overview of the operation analysis automation framework: industry problem definitions, observed machine notations on the floor, change in floor MES entry rate, structure of brand cost sheets. ↩
- SIJE internal document. Tense data core definition: scale and period of source data, CM formula, standard time ruling rules, processing of incoming values, validation on similar styles, input principles. ↩
- SIJE internal document. Stage definitions of the six stages of manufacturing knowledge assetization. ↩