
Knowledge AI series 2/7 · (1) How Apparel Orders Are Split Between Knowledge Services and Manufacturing · (2) Where Information Changes Hands in the Supply Chain Workflow · (3) Why the Same Order Number Is Entered Again and Again Until Shipment · (4) Why Production Data Measured on the Floor Gets Lost · (5) Why CM Is the Only Shared Variable in FOB Cost · (6) Why Vendor and Factory Calculate the Same CM in Opposite Directions · (7) How Measured Values Become a Company Asset
KEY POINTS
The information in a single order passes through human hands at six handoffs between order intake and shipment: order intake, costing, materials, production, inspection and shipping. That’s because buyer PLM, vendor ERP and factory paper reports don’t connect. Five problems (repeated manual entry, transcription and copy paste, unit and notation mismatch, missing updates, and resends without version control) each show up at specific handoffs, and most surface too late to fix.
It’s Monday morning in a vendor office, and this is a scene you see all the time. The Tech Pack for a new woven jacket style is sitting on the buyer’s PLM as a .pdf, and the PO came in separately as an email attachment. Let’s call the style WJ-2411 (a made-up number, not a real order).
The merchandiser opens the ERP order entry screen next to the in-house order sheet (.xlsx) and types the same style number and quantity three times. No fabric has been ordered and no line has been booked, yet this order has already gone through human hands twice.
In three-party trade, it makes sense for the buyer, the vendor and the factory to split the work. The buyer sells clothes to the market, the vendor looks after everything from order management and costing to materials, production planning and trade, and the factory handles cutting, sewing, inspection, packing and shipping. The problems come less from splitting the work than from passing information between the parties that share it. Let’s go through the points in a single order where information is passed on.
Different Systems at Each of the Three Parties
The buyer works in PLM and a supplier portal, the vendor in ERP and Excel, and the factory in paper reports, whiteboards and messenger apps. These systems are not connected to each other.
So information is passed on as files and paper. Tech Packs and purchase orders go as .pdf, costing, BOMs and spec sheets as .xlsx, instructions and confirmations in email bodies, urgent changes as messenger texts and floor photos, and output on paper reports. “We send it to the ERP” sounds simple, but to know what is actually being passed on, you have to check the file formats.
Six Handoffs from Order to Shipment
From order intake to shipment, the information in one order passes through human hands six times.
| Handoff | What moves | How it moves |
|---|---|---|
| Order intake | Tech Pack PO | Buyer PLM → vendor ERP typed in by hand |
| Costing | Cost items CM | Excel → ERP CM by email |
| Materials | Consumption, PO delivery dates | ERP → Excel orders by email, date changes by messenger |
| Production | Work order sheets line plan, output | Work orders on paper line plan in Excel, output as photos |
| Inspection | Logs, reports approval | Paper log → Excel approval by email, submitted on the buyer portal |
| Shipping | Invoice, packing list shipped quantity | ERP and Excel side by side documents by email, ASN on the portal |
In every one of the six, someone reads a document and types it in somewhere else. Where the systems are not connected, people type the information in themselves.

Where the Five Problems Occur
Five problems keep coming back on the floor, and each one tends to occur at particular handoffs.
| Problem | Why it happens |
|---|---|
| Repeated manual entryOrder intake · Costing · Production · Shipping | A .pdf is made to be read, so measurements, quantities and color codes get read by eye and typed again. Output and shipped quantities go the same way. |
| Transcription and copy pasteOrder intake · Production · Inspection | The buyer’s order sheet is rebuilt in the in-house format. Excel spec sheets are copied onto whiteboards and paper reports. |
| Unit and notation mismatchOrder intake · Inspection | Buyer specs are often in inches and in-house standards in cm. Everyone converts a little differently. |
| Missing updatesAll handoffs | Changes are approved by messenger or in conversation and never make it back into the source document. |
| Resends without version controlCosting · Inspection | With .pdf files arriving from several people, the factory struggles to tell which one is current. |

Two of these look exactly the same in factories abroad. Hourly output is still commonly collected by having operators write their quantities on paper, then a work study staff member walks the end of each line, gathers those numbers and writes them again on the production board.2 Tech Packs are no different. Changes passed on verbally or over messenger never make it into the document, and the factory can’t tell which of several PDFs from several senders is the current one. A factory can end up working from an older revision for weeks before anyone notices.3
Quality control has the same problem. When inspections are run on pen and paper, faxes, emails and spreadsheets, email threads get long, messages get lost, inspection reports arrive late and no two look alike.4 Checking by hand whether the product mix matches the order is cumbersome and error prone for factories.5 Collaboration between organizations still mostly means pulling data out into files and sending them back and forth.6
What makes it worse is that these problems surface late. A wrong spec entry only comes to light when the buyer sends a correction, and a spec version mix-up only when a garment fails inspection. Output gaps appear right before shipment, cost disputes arise at month end closing, and what only one person knew becomes a gap after that person leaves.
If you find out the spec version was different after cutting is already done, about all you can do is adjust the quantity.
Differences in Time Zone, Language and System
There are reasons these handoffs don’t simply go away.
The first is time. Buyers in the Americas and Europe can be up to 12~14 hours apart from factories in Southeast Asia.1 A question the factory posts in the morning gets read in the buyer’s evening, and the answer lands on the factory’s next morning. Getting an answer to one question takes a full day.
The second is language. Buyers use English, vendors Korean and Chinese, and factories Vietnamese, Indonesian and Bengali.1 The same operation goes by three names, and inspection standards drift a little in translation. That’s why the industry has tended to deal with this by agreeing on one standard rather than by improving translation. Calculating SMV from 39 motion codes so buyers and suppliers talk on the same basis is a typical example.7
The third is the different systems at the three parties, which we looked at earlier. Some products tackle this with multilingual screens: there are production planning tools in 7 languages including Korean, Vietnamese and Indonesian8, and inspection apps in 9 languages including Vietnamese and Chinese.9

Five Approaches the Industry Uses
Public sources point to five broad approaches: letting all three parties see the order as one shared record (SSOT), bringing factories in directly through a supplier portal, using document AI to pull fields out of .pdf files, sending changes and delays as system alerts, and letting the factory floor enter data on mobile devices.10
This direction was flagged some time ago. As early as 2017, more than 80% of apparel CPOs (chief procurement officers) said they expected digitized end to end process management.11

One thing worth saying up front: we couldn’t find a credible source that puts a number on what re-entry or version conflicts actually cost. So you won’t find a figure like “N hours lost per year” here. We think the first step is to pin down exactly where the problems repeat.
In the Monday morning scene at the start of this post, what all five approaches are trying to reduce is the merchandiser typing the same style number and quantity three times.
How SIJE Handles These Handoffs
SIJE’s basic approach is to let all three parties look at the same order record. Upload the buyer’s .pdf Tech Pack, the vendor’s .xlsx costing sheet and the factory’s paper report to Monolis as they are, and they are turned into structured data. For language, we use a standard process glossary that makes everyone call the same operation by the same name. It currently holds 2,186 entries in 5 languages: Korean, English, Indonesian, Vietnamese and Japanese.12 Monolog reduces the time zone problem. Once a floor measurement is recorded, all three parties can see the same value right away, so nobody has to wait for someone to copy it over the next morning.
The next post, Why the Same Order Number Is Entered Again and Again Until Shipment, looks at how a single stage is handled inside one company. We look at why the same order number is entered again in each tool over the six stages.
Knowledge AI series
1. How Apparel Orders Are Split Between Knowledge Services and Manufacturing
2. Where Information Changes Hands in the Supply Chain Workflow (this post)
3. Why the Same Order Number Is Entered Again and Again Until Shipment
4. Why Production Data Measured on the Floor Gets Lost
5. Why CM Is the Only Shared Variable in FOB Cost
6. Why Vendor and Factory Calculate the Same CM in Opposite Directions
7. How Measured Values Become a Company Asset
References
- SIJE internal data, O1-B disconnection diagram source v1. Time zone gap and languages used by each party. ↩
- Online Clothing Study, Hourly production report. How hourly output is collected. ↩
- Wave PLM, Tech Pack Version Control. Missed changes and version confusion. ↩
- Inspectorio, The Technology Tipping Point for the Quality Control Industry. Problems with traditional QC. ↩
- BCG, Agility Is Fashion’s New Source of Competitive Advantage, 2023. Manual checks at factories. ↩
- Palantir, Enabling Greater OEM Supplier Collaboration. Manual exchange of one-time data extracts. ↩
- Coats Digital, GSDCost. SMV from 39 motion codes. ↩
- Coats Digital, FastReactPlan. 7 languages. ↩
- Inspectorio QRM, App Store. 9 languages. ↩
- Product sources for the five approaches: Palantir Data Connection, Palantir data model docs, Palantir Document Intelligence, Infor Nexus Supplier Management, TradeBeyond CBX Partner, Inspectorio Quality Platform. ↩
- McKinsey, Digitization: the next stop for the apparel sourcing caravan, 2017. Survey of apparel CPOs. ↩
- SIJE sewing process glossary v4.4. Unique entries and languages. ↩
