profile
Door
More view more view
Recording the apparel supply chain
through shop-floor numbers and data

Why the Same Order Number Is Entered Again and Again Until Shipment

Export cartons, a packing list and a spreadsheet on a tablet in a garment factory finished goods warehouse

Knowledge AI series 3/7 · (1) How Apparel Orders Are Split Between Knowledge Services and Manufacturing · (2) Where Information Changes Hands in the Supply Chain Workflow · (3) Why the Same Order Number Is Entered Again and Again Until Shipment · (4) Why Production Data Measured on the Floor Gets Lost · (5) Why CM Is the Only Shared Variable in FOB Cost · (6) Why Vendor and Factory Calculate the Same CM in Opposite Directions · (7) How Measured Values Become a Company Asset

KEY POINTS

An order goes through six stages: order intake, costing, materials, production, inspection and shipping. At each stage, three or four of these are in use: PLM, ERP, spreadsheets, email, messenger apps and paper. Every time the tool changes, someone types in the order number, style, quantity and delivery date again. Each tool is there for a reason, so cutting the number of tools does not solve the problem by itself. The master data has to be set up first, and its values have to reach every field that needs them without errors.

It’s fabric ordering day for WJ-2411. The vendor’s materials manager has four windows open. In the ERP, she creates the purchase order (P/O) that goes to the fabric supplier. In a spreadsheet, she works out fabric consumption from the quantities by size. She attaches the P/O to an email and sends it, and she asks for the fabric arrival date on a messenger app. At the top of all four windows is the same order number, which she typed into each window herself.

The previous post, Where Information Changes Hands in the Supply Chain Workflow, looked at the points where information passes between the buyer, the vendor and the factory. This post looks at what happens inside one company while it handles a single stage. We look at why the same order number ends up being entered again and again until the order is finished.

The six order stages and the tools and records used at each stage
An order goes through six stages, and at each stage the person in charge works with three or four tools at once

Four pieces of master data in an order

Some values in an order must not change from start to finish. These are called master data. Gartner defines master data as the smallest set of consistent, uniform identifiers and attributes that uniquely describe a company’s core entities and are used across multiple business processes.1

A parcel tracking number is a good way to picture it. While a box moves through the pickup hub, the line-haul truck, the regional terminal and the delivery driver, its tracking number never changes. That is why the box can be found by that one number at any stage. An order works the same way. In an apparel order, four values play this role.

Master dataWhat it identifiesWhat happens if it changes
Order numberThis one orderIts records get mixed up with other orders
StyleWhich garment (style number, color, size breakdown)Fabric is ordered and cut to the wrong specification
QuantityHow many pieces to makeFabric consumption, line plan, inspection sample size and shipping documents all go out of line
Delivery dateWhen it has to ship (Delivery Cargo Date)Line allocation and fabric arrival schedule go out of line

The order master data that must keep the same value through all six stages

Once these four values are set at order intake, they must stay the same until shipment. The problem is that they are not kept in just one place.

The tools used at each stage

At each of the six stages an order goes through, the person in charge switches between several tools. By stage, it looks like this.

StageTools and records in use
Order intakeTechPack and spec sheet in PLM, P/O received by email, spreadsheet order sheet, order entry in ERP
CostingSpreadsheet cost sheet, ERP quotation, CM requests sent back and forth by email
MaterialsP/O and BOM in ERP, spreadsheet materials list, P/O sent by email, arrival date checks on messenger
ProductionDaily production report on paper and whiteboard, spreadsheet line plan, photo reports on messenger
InspectionPaper inspection log, spreadsheet AQL report, report sent by email, upload to buyer PLM
ShippingInvoice and packing list in ERP, spreadsheet shipped quantities, documents sent by email, ASN entry in buyer portal

Handling one stage takes three or four tools

Even when the tool changes, the order number, style, quantity and delivery date have to be written again at the top of almost every record. The tools are not connected to each other, so the person in charge enters them by hand.

Why each tool is used

At this point it may seem that the answer is to merge everything into one tool, but each of these tools is used on the floor for a reason.

The buyer’s PLM and portal are not tools the vendor gets to choose. Information has to be uploaded where the buyer says, in the format the buyer sets. The ASN (advance ship notice) at the shipping stage is a typical example. An ASN is a document that tells the receiver what is arriving, and how, before the goods get there.2 One fashion retailer’s vendor manual requires carton labels to match exactly what is written on the corresponding P/O.3 If even one digit of the order number is wrong, it causes a problem at receiving.

There are no PCs on the factory line. For a line supervisor checking work instructions and writing down hourly output, paper and a whiteboard are the fastest and most reliable. For urgent checks between countries in different time zones, messenger apps are the most convenient, and for work like a cost sheet, where you change cells and recalculate under different conditions, spreadsheets are easier.

Trying to run everything on one system has its limits too. Thomas Davenport pointed out that an enterprise system, by its very nature, imposes its own logic on a company’s strategy, organization and culture.4 In practice, many companies running a large ERP also use separate solutions for niche functions.5 Having several tools is not unusual in itself.

What happens when one quantity changes

The problem is that the same value is stored separately in each tool. As soon as a value changes once, this becomes obvious.

Say the quantity for WJ-2411 changes at the buyer’s request (this is an example). The buyer corrects the quantity in PLM and emails a revised P/O. From then on, the person in charge has to find each related record and correct it.

Records that have to be corrected at six stages when the quantity changes (example)
When the quantity changes, the person in charge has to find and correct the records at all six stages (example)

If even one of these is missed, that record stays at the old quantity. If the consumption sheet is not updated, fabric runs short or is left over. If the line plan is not updated, the line schedule goes wrong. AQL sample sizes depend on lot size, so the inspection criteria change too.6 If the invoice and ASN are not updated, there is a problem at receiving.

Another problem is that when a value copied by hand is wrong, it is hard to notice. In an experiment with 195 undergraduates, visually checking entered values produced 2958% more errors than entering the data twice and comparing, and showed no clear advantage over entering the data only once. On top of that, only 0.06% of entry errors were blank or out of range and easy to spot.7 In other words, most wrongly entered quantities look like normal numbers. If 3,000 is typed as 3,300, it is hard to see that anything is wrong.

Order management that relies on people’s memory

Even so, most orders finish without trouble because the person in charge remembers how these records relate to each other. Which file is the latest, whether the revised P/O made it into the fabric order, what quantity the factory used for its line plan: people keep all of this in their heads.

This kind of knowledge is called tacit knowledge. It is knowledge that is not written down and exists only as experience and memory. Because order management relies more on the tacit knowledge of the people in charge than on systems, orders run into trouble when someone goes on leave or leaves the company. How to turn tacit knowledge into a company asset is covered in the last post of the series.

What to do before cutting the number of tools

So before reducing everything to one tool, the first step is to make sure the same value does not have to be entered again in each tool.

The concept needed here is data integrity. The US National Institute of Standards and Technology (NIST) defines data integrity as the property that data has not been altered in an unauthorized manner, and says it covers data in storage, during processing and while in transit. Data that is changed or lost by accident also counts as a loss of integrity, not only unauthorized changes.8 Every time the order number is moved from ERP to a spreadsheet and then to an email, that is a transfer, and each transfer is a chance for the value to go wrong.

Bringing in a new system does not solve this on its own either. McKinsey points out that when apparel companies adopt new tools but neglect to clean up and enrich their data, the benefits can fall short.9 What master data management aims for is one reference version that keeps the values consistent across every copy of the master data.10 There can be several tools, but there should be one original for the order number, style, quantity and delivery date, and each tool should pull its values from that original.

To keep information accurate and consistent, the master data has to be set up properly first, and its values have to reach every field that needs them without errors.

The same goes for the materials manager at the start of this post. The order number should be entered once at order intake, and the four windows should pull that value in.

How SIJE handles this

Monolis sets up the order number, style, quantity and delivery date as one order record at order intake, and every stage from costing to shipping works from that record. When the buyer’s .pdf P/O and TechPack are uploaded, their contents go into the input fields, and when the quantity changes, the cost sheet, material consumption and line plan that use that value are updated together from the same record. Tools that cannot be removed, such as buyer portals and the factory’s paper daily reports, stay as they are. The goal is for the values that go into and come out of those tools to come from the same order record.

The next post, Why Production Data Measured on the Floor Gets Lost, covers WJ-2411’s first week on the line. We look at how the numbers from the line are measured, and why they don’t get used again for the next order.

Knowledge AI series
1. How Apparel Orders Are Split Between Knowledge Services and Manufacturing
2. Where Information Changes Hands in the Supply Chain Workflow
3. Why the Same Order Number Is Entered Again and Again Until Shipment (this post)
4. Why Production Data Measured on the Floor Gets Lost
5. Why CM Is the Only Shared Variable in FOB Cost
6. Why Vendor and Factory Calculate the Same CM in Opposite Directions
7. How Measured Values Become a Company Asset

References

  1. Gartner, IT Glossary, Master Data Management (MDM). Definition of master data. ↩
  2. GS1 UK, ASN message implementation guideline v1.5, 2015. Definition of the ASN (advance ship notice). ↩
  3. Shopbop, Vendor Operations Manual, 2026. Requirement that carton labels match the P/O. ↩
  4. Thomas H. Davenport, Putting the Enterprise into the Enterprise System, Harvard Business Review, 1998. Enterprise systems imposing their own logic on a company. ↩
  5. Panorama Consulting Group, 2024 ERP Report, p.9. Niche solutions used alongside large ERP systems (material from an ERP consultancy). ↩
  6. ISO 2859-1:2026, Sampling procedures for inspection by attributes, Part 1. International standard for sampling inspection by attributes (AQL). ↩
  7. Kimberly A. Barchard & Larry A. Pace, Preventing human error: The impact of data entry methods on data accuracy and statistical results, Computers in Human Behavior 27(5), 2011. Errors from visual checking compared with double entry, and the 0.06% share of out-of-range errors. ↩
  8. NIST Computer Security Resource Center, Glossary, data integrity. Definition of data integrity (storage, processing and transit, including accidental changes). ↩
  9. McKinsey & Company, Reimagining the apparel value chain amid volatility, 2024. Limits of adopting systems without cleaning up data. ↩
  10. CIO.com, What is master data management? Ensuring a single source of truth, 2021. One reference version across all copies of master data. ↩
back icon Back