profile
Door
More view more view
Recording the apparel supply chain
through shop-floor numbers and data

How Clothes Are Made: From Yarn to the Buyer’s Warehouse

How clothes are made, from fabric production to sewing and shipping

Apparel supply chain basics 1/2 · How Clothes Are Made: From Yarn to the Buyer’s Warehouse

KEY POINTS

A garment starts as fiber that is spun into yarn, woven or knitted into fabric, then dyed and finished. At the garment factory, the fabric goes through inspection, relaxation, spreading and cutting, bundle sewing, inline and end-line inspection, finishing and packing, and a final inspection before shipment, and the finished goods are then received at the buyer’s distribution center. Machines do most of the work up to the fabric stage, but sewing is still done by operators who hold the fabric by hand and feed it into the machine, which is why apparel production is the most labor-intensive stage of the value chain. At each step, numbers such as fabric points, marker efficiency, SMV by operation, DHU and AQL results are recorded, and they become the basis for decisions at the next step.

The care label inside a cotton T-shirt you pick up in a store usually names only one country. But before it reaches the customer, that T-shirt has passed through a mill that spins yarn from cotton, a mill that turns yarn into fabric, a garment factory that cuts and sews the fabric, and the buyer’s distribution center. The country on the label is the one where it was sewn.

This post goes through the steps a garment takes, from yarn to the buyer’s warehouse, in order. Looking at what happens at each step and what number is recorded there also makes it easier to see why garment factories rely so heavily on people, and why process analysis has such an effect on cost.

Eleven steps in making a garment and the number recorded at each
A cotton T-shirt passes through a textile mill, a garment factory and the buyer’s distribution center, in that order

The three places a garment passes through

Making clothes happens in three broad places: the textile mill that makes yarn and fabric, the garment factory that turns fabric into clothes, and the buyer’s distribution center that receives finished garments and sends them to stores and online orders. Orders, schedules and fabric supply between these three are mostly coordinated by the vendor. What the buyer, the vendor and the factory each do is covered in How Apparel Orders Are Split Between Knowledge Services and Manufacturing.

Of the three, the garment factory is where the most handwork goes in. A World Bank paper notes that the most labor-intensive activity in the textile and apparel value chain is apparel production, followed by yarn and fabric production.1 Fabric is soft and changes shape while it is being worked, so holding it, turning it and feeding it into the machine is still done by the operator’s hands.

Step 1: Making yarn (spinning)

Spinning turns loose fiber into yarn. Raw cotton picked from the plant comes in tangled tufts mixed with trash such as seed coat and leaf fragments, so the first step is to open the tufts and clean out the trash with opening and cleaning machines.2

Next comes carding. Rotating cylinders covered in wire separate the fibers one by one and remove the remaining small trash and neps, the small knots of tangled fiber.2 It is similar to combing tangled hair. After carding, the fiber becomes a loose rope called sliver.

In drawing, several slivers pass together through rollers that turn progressively faster, which lines the fibers up and blends them evenly.2 In roving, the strand is thinned to about the thickness of a pencil and lightly twisted,2 and in the final spinning step it is drawn out to the target thickness and twisted into yarn.

Step 2: Making fabric (weaving and knitting)

There are two main ways to make fabric. Weaving interlaces yarns at right angles; the yarns running along the length are the warp, and those running across the width are the weft.3 Woven fabrics for shirts and jeans are made this way. Knitting forms yarn into loops and links the loops together.4 Single jersey, the usual T-shirt fabric, is a typical knit.

Weaving has preparation steps: warping, which winds the warp yarns onto a beam at even tension; sizing, which coats the warp with size; and drawing-in, which threads each warp yarn through the loom parts.3 Sizing wraps the yarn in a thin film that reduces hairiness and improves abrasion resistance and strength.3 Inside the loom, warp yarns move up and down countless times and rub against the weft. The size is washed out again after weaving, in a step called desizing.3

Step 3: Dyeing and finishing

Textiles can be dyed at almost any stage, from fiber to yarn to fabric. Manufacturers prefer to dye at the fabric stage.5 They can keep undyed white fabric in stock and dye it to the color ordered, which keeps inventory down.

Finishing means any process, other than preparation and coloring, that gives the fabric or garment useful or desired properties.6 Wrinkle resistance, water repellency and a softer hand are added at this stage. The finished fabric is wound onto rolls and sent to the garment factory.

Step 4: Fabric inspection (the 4-point system)

When fabric arrives at the garment factory, it is checked for defects before cutting. Missing picks, stains and holes have to be found before cutting so that defective areas do not end up in a garment.

A widely used method is the 4-point system (ASTM D5430). Each defect gets penalty points according to its length, and no single defect can get more than 4 points.7

Defect lengthPoints
3 inches or less1
Over 3, up to 6 inches2
Over 6, up to 9 inches3
Over 9 inches4

Penalty points by defect length in the 4-point system

The points for each roll are added up and converted to points per 100 square yards, so that rolls of different widths and lengths can be compared.7

Points per 100 sq yd = total points × 36 × 100 ÷ (fabric width in inches × length inspected in yards)

For example (these are hypothetical values), if 120 yards of 60-inch fabric are inspected and the points add up to 24, the result is 24 × 36 × 100 ÷ (60 × 120) = 12 points. Many factories accept up to 40 points per 100 square yards, but the final standard is set by the buyer.7

4-point system points by defect length and a worked example per 100 square yards (hypothetical)
Assigning points by defect length and converting them to points per 100 square yards (hypothetical values)

Step 5: Fabric relaxation

Fabric is under tension when it is wound onto rolls. If it is cut straight away, it can shrink a little after cutting and throw the measurements off. So before cutting, the roll is unwound and the fabric is given time to return to its natural state. This is called fabric relaxation, and its purpose is to keep the fabric’s shape and measurements the same after cutting.8

Relaxation time depends on the fabric. One industry procedure sets 12 hours for 100% cotton single jersey and 48 hours for single jersey blended with spandex.8 The stretchier the fabric, the longer it needs.

Step 6: Spreading, marker and cutting

Fabric is not cut one layer at a time. It is first spread out in many plies, and a marker is laid on top so all the layers are cut at once.9 A marker is a layout that shows how the garment pieces should be cut from the stacked fabric.9 Markers are often made with CAD software and printed out.

How well a marker is laid out is measured by marker efficiency: the share of the total marker area taken up by garment pieces.10

Marker efficiency (%) = total area of garment pieces ÷ (marker length × marker width) × 100

For example (hypothetical values), if the marker covers 5.0 square meters and the garment pieces on it add up to 4.2 square meters, marker efficiency is 84%. The other 16% becomes offcuts between the pieces. Because fabric makes up a large part of garment cost, a few points of marker efficiency change how much fabric the whole order needs.

Step 7: Bundling and sewing

Cut pieces are numbered, grouped by size and color, tagged with a bundle ticket and sent to the sewing room.1112 The bundle ticket carries the style, size, color and quantity, so each piece can be traced to the garment it will become. Shades can vary slightly from roll to roll even for the same fabric, and if the front and back of one garment come from different rolls, the color may not match.

On a sewing line, no one makes a whole garment from start to finish. Each operator receives a bundle, sews the same part over and over, and passes it to the next operator.11 So before sewing starts, the garment is broken down into operations and listed in sequence in an operation breakdown.13 The operation breakdown usually shows the machine and the standard time (SMV) for each operation.

For a basic T-shirt, the main assembly operations are bottom hemming, shoulder joining, neck trim, sleeve assembly, sleeve setting and shoulder taping.9 A study of one factory in Bangladesh broke a basic T-shirt into 12 operations and calculated an SMV of about 4.92 minutes per piece.14 Because this is one factory’s case, it cannot be applied directly to other factories, but it shows that even a simple T-shirt passes through many people’s hands. Apparel manufacturing uses about 30 stitch types and about 300 seam types.9

Main labels and care labels are rarely added to the finished garment afterwards. In most cases they are sewn in at the neck or side seam partway through sewing, while the garment is still semi-finished. So label attaching is also an operation in the operation breakdown.

How to read an operation breakdown, and how to use SMV to set line targets and staffing, is covered in detail in How to Read an Operation Breakdown: Operations, SMV, Takt, Man Power.

Step 8: Inline and end-line inspection

Quality checks during sewing are split in two. Inline inspection checks parts and partly assembled garments while they are being made,15 and end-line inspection checks at the end of the sewing line that the garment is properly assembled and free of sewing defects.11 Inline inspection is there to find and stop an operation that keeps producing defects early, and end-line inspection is there to keep defective garments from moving on.

Inspection results are recorded as DHU, the number of defects found per 100 garments inspected. If one garment has several defects, each one is counted separately.16 Looking at DHU by line and by hour shows which operations the defects are coming from.

Step 9: Finishing and packing

After sewing, garments go to finishing. Loose threads are trimmed, and the garment is pressed into shape with heat, steam and pressure.17 Work such as thread trimming, which corrects what earlier operations left behind rather than adding value, is classed as non-value-added work.18 The shorter the threads are cut at the sewing stage, the less time finishing takes.

Finished garments are folded, tagged, put into polybags and packed into export cartons.19 Which sizes and colors are in each carton, and how many, is recorded on the packing list. A packing list shows the type of package, the number of packages, and the net and gross weight.20

Step 10: Final inspection before shipment (AQL)

Before shipment, the buyer or an inspection company appointed by the buyer carries out a final inspection. It is usually done once 80~90% or more of the order has been packed, by pulling cartons at random and checking the garments inside.21

Since not every garment can be checked, the sampling tables of the international standard ISO 2859-1 are used. This is usually called AQL inspection. The order quantity determines how many garments are sampled, and general inspection level II is normally used for visual checks.22 Common acceptance settings are 0 for critical defects, 2.5 for major defects and 4.0 for minor defects.23 These are settings that inspection companies often use, and actual standards differ from buyer to buyer.

If an order fails final inspection, the lot has to be opened, re-inspected and repaired, and the shipment date slips. That is why factories try to catch as many defects as possible at the inline and end-line stages.

Step 11: Shipping and receipt

Cartons that pass final inspection are loaded into containers and shipped. Under FOB, a term commonly used in apparel exports, delivery is complete once the seller loads the goods onto the vessel nominated by the buyer at the port of shipment.24 How FOB breaks down from a cost point of view is covered in Why CM Is the Only Shared Variable in FOB Cost.

So that the buyer can prepare to receive the goods, the supplier sends an ASN (advance ship notice) before the shipment arrives. An ASN tells the receiving team in advance what is coming and when.25 The cartons are received at the buyer’s distribution center and sent on from there to stores and online orders.19

The numbers recorded at each step

Looking back, a number is recorded at each step a garment goes through.

StepNumber recordedWhat it is used to decide
Fabric inspectionPoints per 100 sq ydWhether the fabric passes, supplier quality
RelaxationRelaxation timeWhen cutting can start
CuttingMarker efficiency, cut quantityFabric consumption, fabric cost
SewingSMV by operation, output by hourLine staffing, daily target, CM
Inline and end-lineDHUWhich operations the defects come from
Final inspectionAQL sample size, defects foundWhether the order can ship
Shipping and receiptPacking list quantity, ASNReceiving preparation, payment

The number recorded at each step and the decision it supports

Most of these numbers are written down by different people in different tools. The fabric inspection sheet is on paper, marker efficiency is in CAD, SMV by operation is in a spreadsheet, and the shipped quantity is in the ERP. Why the numbers for one order end up spread across so many tools is covered in Why the Same Order Number Is Entered Again and Again Until Shipment.

How SIJE handles this process

SIJE brings the numbers recorded inside the garment factory together into one order record. In Monolis, uploading a TechPack and work order produces the operation breakdown and SMV by operation, and fabric consumption and CM are calculated on the same order basis. Monolog measures output and cycle time by operation on the sewing line, so hourly output and time by operation build up on the same order without anyone copying them over. How process analysis leads to cost can be seen with screenshots in Process Analysis Is Cost Design: Six Steps Where AI Builds the CM.

If you want to know how long people have been wearing clothes, and why spinning and weaving were taken over by machines while sewing stayed in human hands, read on in The History of Clothing: From the First Clothes to Today’s Supply Chain.

Related posts

References

  1. Gary Gereffi & Stacey Frederick, The Global Apparel Value Chain, Trade and the Crisis, World Bank Policy Research Working Paper 5281, 2010. Apparel production as the most labor-intensive activity in the value chain (p.13~14). ↩
  2. Cotton Incorporated, Textile Yarns. Opening and cleaning (p.4), carding (p.7), drawing (p.9), roving (p.12). ↩
  3. Cotton Incorporated, Textile Weaving. Definition of weaving (p.3), weaving preparation (p.4), purpose of sizing (p.5), desizing (p.7). ↩
  4. Pratt Institute Textile Research Lab, Knits. Definition of knit fabric. ↩
  5. Britannica, Textile: Dyeing and printing. Dyeing stages and the preference for piece dyeing. ↩
  6. CottonWorks, Chemical Finishing. Definition of finishing. ↩
  7. V-Trust, Understanding the 4-Point System for Fabric Inspections, with a summary of ASTM D5430. Points by defect length, 4-point cap per defect, conversion to 100 square yards and acceptance level (inspection company material). ↩
  8. Textile Details, Complete Fabric Relaxation Procedure. Purpose of fabric relaxation and example times by fabric (industry procedure). ↩
  9. CottonWorks, Garment Construction. Marker and spreading, main T-shirt assembly operations, number of stitch and seam types. ↩
  10. Textile Learner, Marker Making, Planning, Efficiency and Use of CAD. Definition of marker efficiency. ↩
  11. Textile School, Pre-Production, Production and Post-Production Process in Garment Industry. Bundling and transfer to the sewing room, bundle-based sewing, end-line inspection. ↩
  12. Textile Engineering, Bundling in Garment Manufacturing. Bundle tickets and sorting by size and color. ↩
  13. Textile Learner, Operation Breakdown in Garment Industry. Definition of an operation breakdown. ↩
  14. Howlader et al., International Journal of Engineering and Computer Science 4(3), 2015. Basic T-shirt broken into 12 operations and SMV calculation (p.10688, single-factory case). ↩
  15. Apparel Resources, Online and Final Inspection in Cutting, Sewing and Finishing. Definition of inline inspection. ↩
  16. Apparel Resources, Improve Quality Levels using Measurement Tools. Definition of DHU and how defects are counted. ↩
  17. Textile School, Pressing or Folding in Garment Manufacturing. Definition of pressing. ↩
  18. Apparel Resources, Improving Finishing Times. Non-value-added work such as thread trimming. ↩
  19. Textile School, Garment Production Process. Packing and shipment to the buyer’s distribution centers. ↩
  20. International Trade Administration, Common Export Documents. Contents of a packing list. ↩
  21. Textile School, Garment Inspection. Timing of final inspection and random sampling. ↩
  22. QualityInspection.org, AQL Inspection Levels in ISO 2859-1. General inspection level II. ↩
  23. InTouch, What does AQL 2.5 mean?. AQL settings by defect class (inspection company material). ↩
  24. ICC Academy, Incoterms 2020: FAS or FOB. FOB delivery terms. ↩
  25. SPS Commerce, EDI 856 Advance Shipping Notice. Role of the ASN. ↩
back icon Back