profile
Door
More view more view
Recording the apparel supply chain
through shop-floor numbers and data

The History of Manufacturing Software: How MRP Branched into ERP, PLM, APS, MES and WMS

A factory planning office running from a 1960s mainframe and blueprints through a 1990s monitor and barcode scanner to modern production dashboards

Business systems basics 2/4 · (1) ERP, MES, PLM, WMS and APS · (2) The History of Manufacturing Software · (3) How an Apparel Order Travels Through Three Companies’ Systems · (4) Why SIJE Built Supply Chain Software as One

KEY POINTS

Manufacturing software did not start out as one program. MRP, which calculated material requirements in a tractor plant in the 1960s, went through MRP II and was named ERP around 1990. Alongside it, CAD for engineering drawings grew into PLM, scheduling programs that tried to reflect the limits of equipment capacity became APS, systems that recorded floor output became MES, and systems for warehouses and barcodes became WMS, each on its own. Because each branch began with a problem in a different department, the names and the companies behind them differed, and in the decades that followed there were repeated attempts to connect the branches again.

In 1954, GE bought a UNIVAC I computer for its appliance plant in Louisville, Kentucky. It was the first commercial sale of the UNIVAC I. After the computer arrived in early 1955, the first program put to real work was not payroll but a manufacturing control program for the dishwasher and disposer department. The payroll system was finished later.1

The record shows that the first job manufacturing gave to its new computer was running the plant. In the previous post, I went through what ERP, MES, PLM, WMS and APS each manage today. In this post I will follow, in time order, when and from which industry’s problems these five systems started, and why they grew as five separate branches instead of being born as one.

Timeline of key events in the five branches of manufacturing software from 1955 to 2011
Key events as manufacturing software grew into five branches (years as recorded by each source)

The first branch: from material calculation to ERP

MRP: working out what to order, when and how much

MRP (Material Requirements Planning) is a method that, once you know when and how many finished products to make, works backward to calculate which parts and materials to order, when and in what quantity.

Think of preparing a big holiday dinner. Once you fix the number of guests for Saturday, you work out how much of each ingredient you need, and set dates backward: the turkey has to be ordered a week ahead, the vegetables bought two days before. The list of ingredients is the BOM (bill of materials), and the time it takes from ordering to receiving is the lead time. In apparel terms, it is calculating, once the quantity and ship date of a jacket order are set, how many yards of fabric and how many zippers must be ordered and by when.

The person credited with turning this calculation into a system is Joseph Orlicky. Working at J.I. Case, a maker of tractors and construction machinery, in the early 1960s, Orlicky developed time-phased replenishment planning, which is why he is called the father of MRP.2 J.I. Case worked with IBM to turn the method into a computer program, which is believed to be the first MRP system.3 There is also a record that power tool maker Black & Decker was the first company to adopt MRP, in 1964.4 Orlicky published a book on the method, Material Requirements Planning, in 1975,5 and Orlicky, Oliver Wight and George Plossl led a campaign to spread MRP through American manufacturing.2

MRP II: adding capacity and money to the calculation

MRP calculated materials, but it did not check whether the plant’s equipment could actually make that much, and it was weak at confirming whether things were made as planned. MRP II (Manufacturing Resource Planning) filled that gap. It added a closed loop that feeds shop floor data back into the schedule, capacity planning, sales orders and stock records, and cost accounting modules, and as a result it came to act as an integrated database for the whole company. Oliver Wight published a book on the concept in 1981.6

ERP: from manufacturing to the whole company

Around 1990, Gartner gave it the name ERP (Enterprise Resource Planning).7 The key change is that “Manufacturing” became “Enterprise.” Calculations centered on production and materials widened to cover finance, HR, distribution and sales across the company.

SAP shows the same trend. When five former IBM employees founded SAP in Germany in 1972, their goal was standard business software that integrated all business processes and processed data in real time. They began developing the second-generation R/2 in 1979, and the client-server R/3 released in 1992 took SAP worldwide.8 In a client-server setup, the PCs in each office connect to a central server to do their work.

The second branch: from engineering drawings to PLM

While material calculation software grew in production control and purchasing, a very different kind of software grew in engineering. Sketchpad, created in 1963 by MIT PhD student Ivan Sutherland, let people draw lines directly on a screen to build drawings, and is recognized as the first computer-aided drafting (CAD) program.9

Once drawings were made on computers, the next problem was how to manage them. When the design of one part changes, every drawing and material list containing that part has to be updated, and the floor has to work from the latest drawing at all times. One of the first recorded PLM cases is American Motors in 1985. To speed up development of the Jeep Grand Cherokee, it introduced CAD and stored drawings in one central place, which made engineering changes easier. When Chrysler bought American Motors in 1987, the approach was kept.10

In apparel, this branch leads to TechPack and sample management. What drawings and engineering changes are to a car, the TechPack and the revisions for each sample round are to a garment.

The third branch: schedules within limited capacity, APS

MRP and MRP II basically planned on the assumption that capacity was sufficient. This is called infinite capacity planning. APS (Advanced Planning and Scheduling), by contrast, builds schedules while considering limited materials and finite equipment capacity at the same time.11

Think of a road. If a four-lane road narrows to two lanes on one stretch, the total traffic is set by the two-lane stretch, however wide the road is before and after. A plant is the same: the slowest machine or operation, the bottleneck, sets total output. How the bottleneck operation sets the output of a whole sewing line is covered in What Man Power 0.5 Means: Three Ways to Break a Bottleneck.

An early piece of software that built the bottleneck into the calculation was OPT (Optimized Production Technology). It was developed and sold by Creative Output, a company Eliyahu Goldratt joined, and it is described as the first software to provide finite capacity scheduling for production. In 1984 Goldratt published The Goal, which explains the principles of bottleneck management in the form of a novel.12 Systems under the name APS appeared in the late 1980s,13 and i2 Technologies, founded in 1988, released Factory Planner, which optimized the flow of materials in a plant, as its first product.14

The fourth branch: real-time floor records, MES

As ERP came to handle planning and transactions for the whole company, a gap appeared between the plan and the actual floor. How many pieces each line made today, how many were defective and which machine stopped were hard to know from the daily numbers ERP received.

The name MES (Manufacturing Execution System) was given to this area in 1990 by the research firm AMR (Advanced Manufacturing Research).15 In 1992 MESA, an association to promote MES, was founded,16 and in 1996 MESA published the MESA-11 model, which set out eleven core MES functions.17 In 2000 the first part of the ISA-95 standard came out. Its purpose was to standardize how isolated enterprise systems and floor control systems are connected, reducing the cost of integration and raising its success rate.18 That the information passed between ERP and MES had to be standardized also shows how separately the two had grown.

The fifth branch: warehouses and barcodes, WMS

Warehouse management software grew together with technology for identifying goods quickly and accurately. On June 26, 1974, the first GS1 barcode was scanned at a supermarket in Troy, Ohio.19 Once machines could read the number on each item, tracking goods in a warehouse in real time became possible.

The system most often cited as the first computer-based WMS was used in 1975 at J.C. Penney, an American clothing retailer. Industry sources record that stock was updated at the moment of receipt and dispatch, greatly reducing the time spent searching for items that were not there.20 Of the five branches, warehouse management is the one where a clothing company appears at the starting point.

Why five branches grew

The first problem, first users and recorded starting points of ERP, PLM, APS, MES and WMS
The problem each branch first set out to solve, and where it was first used

Put the five branches side by side and a common pattern appears. Each began with a problem that a different department ran into at a different time. Production control and purchasing wanted to know when and how much material was needed, engineering wanted to manage drawings and changes, planners wanted schedules that fit within bottleneck capacity, the floor wanted to know what was happening now, and logistics wanted to know where goods sat in the warehouse.

It is similar to how a city’s water, power, gas and telecom networks were laid by different agencies at different times. Each network does its job well, but every time a road is dug up, several agencies work separately, and each keeps its own map. Manufacturing software, too, gave rise to specialist companies for each branch, and companies brought in each branch’s product separately as the need arose. That is why it became common for one company to run ERP, PLM, APS, MES and WMS from different vendors.

Attempts to connect them again

While the branches were splitting apart, there were also continuous attempts to tie them together.

PeriodAttemptWhat it did
1974CIMJoseph Harrington first used the term computer-integrated manufacturing in a book21
Around 1990ERPWidened production-centered MRP II to cover the whole company7
1998Cloud ERPNetSuite first offered ERP used over the internet7
2000ERP IIGartner proposed internet-enabled ERP that pulls in data from outside the company7
2000ISA-95Standardized how enterprise systems (ERP) and floor systems (MES) connect18
2011Industry 4.0First presented to the public at Hannover Messe in Germany22

Major attempts to reconnect systems that grew up in separate branches

The table shows integration moving in two directions. One is a single product widening its functions to absorb the work of other branches, as ERP did. The other is setting rules for how separate systems exchange information, as ISA-95 did. Both focused on connecting the systems inside one company.

What this history means for apparel

Look again at the starting points: plants making tractors and construction machinery (J.I. Case), power tools (Black & Decker), home appliances (GE) and cars (American Motors). The basic structure of the ERP, PLM, APS and MES that apparel companies use today was first built in industries like these.

Apparel orders differ from those industries in one respect. As covered in How Apparel Orders Are Split Between Knowledge Services and Manufacturing, one order is divided among three companies, the buyer, the vendor and the factory, which are usually in different countries. Connecting the five branches even inside one company has been a challenge for decades, and in apparel those branches are split across three companies.

Wrapping up

Manufacturing software reached its present form as tools built to solve each department’s problems grew on their own. That is why ERP, PLM, APS, MES and WMS have separate names. Knowing this history makes it easier to see why your company has several systems, and why the spreadsheets and emails between those systems never quite go away.

In part 3, I will follow one apparel order as it passes through the systems of the buyer, the vendor and the factory, to see where information breaks off and gets entered again. Part 4 will cover why SIJE brought these functions together into one piece of software built on the three-party trade structure.

Related reading

References

  1. Burton Grad, First-Hand: The First Commercial Computer Application at General Electric, Engineering and Technology History Wiki. The first commercial sale of UNIVAC I in 1954 and the manufacturing control program running in early 1955. ↩
  2. Journal of Operations Management, The early road to material requirements planning. Orlicky at J.I. Case in the early 1960s and the MRP crusade. ↩
  3. NetSuite, The History of ERP. The early MRP system by J.I. Case and IBM. ↩
  4. Wikipedia, Material requirements planning. Record of Black & Decker’s adoption in 1964. ↩
  5. Joseph Orlicky, Material Requirements Planning: The New Way of Life in Production and Inventory Management, McGraw-Hill, 1975. ↩
  6. University of Cambridge Institute for Manufacturing, Manufacturing Resource Planning (MRP II). Functions added by MRP II and Oliver Wight’s 1981 book. ↩
  7. NetSuite, The History of ERP. Gartner naming ERP around 1990, cloud ERP in 1998, ERP II in 2000. ↩
  8. SAP, SAP History. Founding in 1972, R/2 development from 1979, R/3 in 1992. ↩
  9. Computer History Museum, Sketchpad. Sketchpad in 1963, recognized as the first CAD program. ↩
  10. Concurrent Engineering, A Brief History of Product Lifecycle Management. The American Motors case in 1985 and Chrysler’s acquisition in 1987. ↩
  11. Simio, What is Advanced Planning and Scheduling (APS)?. The infinite capacity assumption and finite capacity planning in APS. ↩
  12. Theory of Constraints Institute, History of TOC. OPT from Creative Output and The Goal in 1984. ↩
  13. Simio, The Untold Story: Production Scheduling Software’s Journey from 1960 to Today. APS appearing in the late 1980s. ↩
  14. Wikipedia, Sanjiv Sidhu. Founding of i2 Technologies in 1988 and Factory Planner. ↩
  15. University of Pretoria Repository, thesis on MES. AMR coining the term MES in 1990. ↩
  16. Wikipedia, Manufacturing Enterprise Solutions Association. MESA founded in 1992. ↩
  17. MESA International, History of the MESA Models. The MESA-11 model published in 1996. ↩
  18. ISA InTech, The ISA-95 Enterprise-Control System Integration standards. Part 1 published in 2000 and the purpose of the standard. ↩
  19. GS1, Marsh holds place of honor in history of GS1 barcode. The first barcode scan in 1974. ↩
  20. control.com, History of Warehouse Management Systems, and Extensiv, A History of Warehouse & Inventory Management Systems [](https://www.extensiv.com/blog/a-history-of-warehouse-inventory-management-systems). The early WMS at J.C. Penney in 1975 (industry sources). ↩
  21. Encyclopedia.com, Computer-Integrated Manufacturing. Harrington’s use of the term CIM in 1974. ↩
  22. deutschland.de, Industry 4.0 at Hannover Messe. First presentation at Hannover Messe in 2011. ↩
back icon Back