
Knowledge AI series 6/7 · (1) How Apparel Orders Are Split Between Knowledge Services and Manufacturing · (2) Where Information Changes Hands in the Supply Chain Workflow · (3) Why the Same Order Number Is Entered Again and Again Until Shipment · (4) Why Production Data Measured on the Floor Gets Lost · (5) Why CM Is the Only Shared Variable in FOB Cost · (6) Why Vendor and Factory Calculate the Same CM in Opposite Directions · (7) How Measured Values Become a Company Asset
KEY POINTS
CM is calculated as standard minutes × cost per minute ÷ line efficiency. Vendors and factories get different answers because they put different standard minutes and efficiency into the same formula. Dropping the efficiency assumption from 60% to 50% raises CM by 20%. When standard minutes, efficiency and cost per minute are agreed from line measurements first, the vendor’s cost sheet and the factory’s daily P&L work at the same time.
It’s quote negotiation day for the woven jacket WJ-2411. The vendor’s costing person and the factory’s sales person sit across from each other, each with a spreadsheet open.
The vendor offers a CM of $5.08 a piece. The factory asks for $6.76. That’s a $1.68 gap, more than 30%. Yet open both spreadsheets and the formula is identical. What differs is the value in two cells.
(All prices, standard minutes and efficiencies in this article are illustrative. They have nothing to do with any real order or SIJE customer.)
The CM Formula
A sewing factory’s CM is usually calculated like this.1
CM per piece = standard minutes (SMV) × cost per minute (CPM) ÷ line efficiency
Standard minutes are the minutes needed to make one piece, and cost per minute is what it costs to run the line for a minute. You divide by efficiency because the factory pays the same wages whether the line runs at 100% or 60%. Lower efficiency means fewer pieces for the same cost, so the cost per piece goes up.
Depending on the source, standard minutes are called SMV or SAM. They mean the same thing. At SIJE we call the planned standard time used in quotes SMV, and the standard time actually measured on the line AMV.
Cost per minute comes from dividing the line’s daily cost by the time available that day (operators × working minutes). Daily target output comes from the same variables.2
Daily target output = operators × 480 minutes × efficiency ÷ standard minutes
Vendor and Factory Put Different Values into the Same Formula
Back to the WJ-2411 negotiation. Let’s say both sides agree on a cost per minute of $0.06.
| Input | Vendor | Factory |
|---|---|---|
| Standard minutes (SMV) | 55 min | 62 min |
| Cost per minute (CPM) | $0.06 | $0.06 |
| Line efficiency | 65% | 55% |
| Resulting CM | $5.08 | $6.76 |
The vendor assumed shorter minutes and higher efficiency. The factory assumed longer minutes and lower efficiency. The difference in standard minutes alone widens CM by 12.7%, and the difference in efficiency alone by 18.2%. Put together, they add up to 33%.

Neither side is being unreasonable. As we saw in the last article, the vendor has a fixed FOB and needs a lower CM to keep its margin, while the factory has a fixed daily line cost and needs a higher CM to break even. Each put in assumptions that make sense for its own books.
| Vendor order cost sheet | Factory daily P&L | |
|---|---|---|
| Fixed | FOB set by the buyer | Daily line cost headcount, wages, overhead |
| Revenue | FOB × quantity | CM × daily output |
| What moves | Lower CM raises margin | Higher CM raises profit |
| Assumptions it uses | Shorter minutes higher efficiency | Longer minutes lower efficiency |
| Gap it carries later | Fabric booked vs. fabric used | Approved minutes vs. minutes actually taken |
How Much Efficiency Moves CM
The formula shows CM is inversely proportional to efficiency, so when the efficiency assumption changes, CM changes in inverse proportion. Drop the assumption from 60% to 50% and CM goes up 20%. In one real example, a CM of 23.02 at 65% efficiency became 29.92 at 50%, close to a 30% difference.3

The question is which efficiency is real. Most factories in Bangladesh are said to run at around 50~60%, while plans are often set at 75%.4 For quotes, 60~75% is realistic on established styles, and the first lot of a new style tends to lose 10~20% efficiency while operators get used to it.3
Standard minutes vary too. A common quoting practice multiplies standard minutes by 1.25 to allow 25% for lost time.5 One factory in Bangladesh takes 17 minutes to make a pair of jeans and is working to bring that down to 14 minutes, the level of the most efficient global firms. A jacket maker is working to raise efficiency from 30~35% to 60% within two to three years.6 With that much variation in minutes and efficiency between factories, it’s natural for the two sides to put different values into a quote negotiation.
Why the Factory Is More Sensitive to Efficiency
Say the WJ-2411 line has 40 operators working 480 minutes a day. At $0.06 a minute, the line costs $1,152 a day.
If the line actually runs at 62 minutes and 55% efficiency, it turns out about 170 pieces a day. At the factory’s CM of $6.76, revenue comes to $1,152, exactly covering cost. But if CM is set at the vendor’s $5.08, the same 170 pieces bring in only $865, leaving the factory $287 short every day.
If the vendor’s assumptions of 55 minutes and 65% efficiency actually hold on the floor, the line makes 227 pieces a day and $5.08 works. The same CM breaks even on one line and loses money on another. And since a factory’s net profit is only a few percent, as we saw in the last article, a few points of efficiency can decide the year.
When Both Books Work at Once
Rearranging the formula a little shows how both sets of books can work at the same time.
Daily output × CM = operators × 480 minutes × cost per minute = daily line cost
When the vendor and the factory use the same standard minutes and the same efficiency, the vendor’s CM (quantity × CM) and the factory’s daily line cost match exactly.7 Rather than starting with price, agree first on three values: standard minutes, efficiency and cost per minute. Pre-agreeing target garment minutes, factory efficiencies and cost per minute shortens the costing cycle and leads to sustainable costs.8 Making labour cost transparent lets suppliers negotiate on the basis of facts.9
If those three values come from line measurements instead of estimates, there is much less to argue about.
From Planned Cost to Confirmed Cost
Pre-costing isn’t settled in one go. It usually goes through three stages.7

The first is the planned pre-cost at order intake. It’s calculated from similar-style history and a rough standard time, and it decides whether to accept the order and what to quote first. The second is the confirmed pre-cost, once process analysis is done and the material ordering plan is finalized. It uses confirmed standard time and confirmed purchase prices, and it sets the selling price, line allocation and ordering. The third is the post-cost after production ends. It gathers what was actually spent, so there’s nothing left to decide, only the P&L to check.
CM agreement should be wrapped up at the second stage, when the rough standard time is replaced by a confirmed one. Raising the issue at post-cost is already too late.
How SIJE Handles This
SIJE uses the standard time measured on the line (AMV) as the basis for the next quote. Monolog is attached at each sewing operation without replacing existing equipment and measures output, cycle time, and running and idle periods by operation. When work motions are measured, the raw video is deleted within 0.5 seconds. The purpose of measurement is not to monitor operators but to prove the line’s production capability with numbers. Once those measurements feed into Monolis cost standards, quotes get more accurate with every repeat order.

The order that the merchandiser was retyping from a Tech Pack on a Monday morning in the second post of the series has now reached the stage where the vendor and the factory negotiate over standard time. When standard time is measured on the line and shared instead of being copied and estimated by hand, both the retyping and the time spent negotiating go down.
The next post, How Measured Values Become a Company Asset, wraps up the series by looking at how values measured on the line and the history built up with each order can stay with the company instead of in one person’s memory.
Knowledge AI series
1. How Apparel Orders Are Split Between Knowledge Services and Manufacturing
2. Where Information Changes Hands in the Supply Chain Workflow
3. Why the Same Order Number Is Entered Again and Again Until Shipment
4. Why Production Data Measured on the Floor Gets Lost
5. Why CM Is the Only Shared Variable in FOB Cost
6. Why Vendor and Factory Calculate the Same CM in Opposite Directions (this post)
7. How Measured Values Become a Company Asset
References
- Online Clothing Study, Garment CM cost estimation using SAM. CM = SAM × cost per minute ÷ line efficiency. ↩
- Online Clothing Study, How to calculate production capacity. Daily output from available time, standard minutes and efficiency. ↩
- Scan ERP, SMV costing and CMT pricing. CM at 65% vs. 50% efficiency, realistic quoting efficiency, first-lot efficiency loss on new styles. ↩
- Online Clothing Study, Why do garment manufacturers plan line efficiency below 100%. Efficiency levels in Bangladesh and planned efficiency. ↩
- CBI (Centre for the Promotion of Imports from developing countries), How to calculate the cost price of an apparel item. Standard minutes × 1.25 for lost time. ↩
- UN DESA and CPD, Garment Study Bangladesh. Jeans at 17 vs. 14 minutes, jacket maker efficiency target. ↩
- SIJE internal data, vendor and factory P&L structure notes v1. The two-ledger identity and the three pre-costing stages. ↩
- Coats Digital, GSDCost. Pre-agreeing garment minutes, efficiency and cost per minute. ↩
- Fair Wear, Labour Minute and Product Costing Calculator guidance. Transparent labour cost and fact-based negotiation. ↩
